Building Control Inspection Prompts

Structured voice dictation templates for site inspections

How to Use This Tool

  1. Open your voice recording app and press RECORD
  2. Select the inspection type from the dropdown below
  3. Read each prompt aloud, then give your answer
  4. Follow through all the prompts systematically
  5. Stop recording when complete
  6. Transcribe later using Otter.ai, Whisper, or similar

Welcome to Building Control Inspection Prompts

Select an inspection type from the dropdown above to view the structured prompts.

Each inspection has been designed to guide you through all the key observations needed for comprehensive site notes.

In the event the further information is necessary links have been provided to give further guidance if required .

1. Excavation for Foundation

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Proximity to existing building or boundarieslink in progess
Prompt
Subsoil type and conditionsSoft Geology mapSI contamination
Prompt
Any trees within 30 meters of foundation and excavation is clay (low medium high)🔗 Calculator
Prompt
Foundation depth in millimetertable 10 AD A
Prompt
Foundation width in millimetertable 10 AD A
Prompt
Any groundwater or land drains presentlink in progess
Prompt
Any drains within or crossing the excavation, protection? , public?Digdat (need login)
Prompt
Does excavation comply with designlink in progess
Prompt
Any concerns or recommendationslink in progess
Prompt
Number of photographs taken
Prompt
Inspection outcome - decision and further instructions

2. Drainage

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Describe location of drainagelink in progess
Prompt
What the drainage serves - gully, SVP or rainwater.LABC Warranty Manual Ch 5
Prompt
Material, fall and bedding materiallink in progess
Prompt
If soakaway, size and infill material - crates or rubble
Prompt
Connections to existing systemlink in progess
Prompt
Compliance with approved drawingslink in progess
Prompt
Photographs taken
Prompt
Inspection outcome - decision and further instructions

3. Oversite Preparation Prior to Concrete

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Radon barrier if applicable mapinformation
Prompt
Methane barrier if applicable map
Prompt
Evidence topsoil removedlink in progess
Prompt
Sub base material, thickness and consolidation information
Prompt
Sufficient space for proposed slab thicknesslink in progess
Prompt
Space for insulation and screed to align with finished floor levellink in progess
Prompt
DPM provision and lappinglink in progess
Prompt
Service entries protectedlink in progess
Prompt
Photographs taken
Prompt
Inspection outcome - decision and further instructions

4. Damp Proof Course

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Type of DPClink in progess
Prompt
Lapped into existing DPC and floor DPMlink in progess
Prompt
DPC lapped or has the provision to be lapped into DPMground bearing slabsuspended timber floorblock/beam
Prompt
Estimate height above ground levelLevel access detail
Prompt
Floor level relationship to DPClink in progess
Prompt
Provision of dpc to lap into dpm (250Mu polythene skirt - 450mm dpc)link in progess
Prompt
Discussion regarding progress to next inspection - roof?
Prompt
Photographs taken
Prompt
Inspection outcome - decision and further instructions

5. Suspended Timber Ground Floor

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Sub floor constructionlink in progess
Prompt
Sub floor at or above ground levellink in progess
Prompt
Air brick provision - cross ventilationlink in progess
Prompt
Timber size, strength class, centres, treatment and support of partitionslink in progess
Prompt
Sub floor void depthlink in progess
Prompt
Insulation and its supportlink in progess
Prompt
Joist hangers, timber below dpc (vertical dpc)link in progess
Prompt
Photographs taken
Prompt
Inspection outcome - decision and further instructions

5.1 Block and beam floors

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Sub floor treatmentlink in progess
Prompt
Depth of void 150mm, trees and clay 300mmlink in progess
Prompt
Air brick provision - cross ventilation - telescopic link in progess
Prompt
Sub floor void depth (150mm / 300mm trees and clay)link in progess
Prompt
beam size and configeration (single / narrow / double / double alternative) 🔗 Calculator
Prompt
Ends treated to protect prestressed barslink in progess
Prompt
dpc arrangement and provision to lap dpmlink in progess
Prompt
type of blockwork - may contribute to U valuelink in progess
Prompt
Photographs taken
Prompt
Recommendation ok to continue or other?

6. Intermediate Floor Construction

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Type of Floor (timber / concrete)timberconcrete
Prompt
Size and spacing of floor joists 🔗 Calculator
Prompt
Support under partition 🔗 Calculator
Prompt
Prompt
Lateral and restraintLateral Restraint
Prompt
Insulation - sound or thermallink in progess
Prompt
Fire Resistance (materboard,supalux and vermiculux) Passive fire protectionFire Resistance
Prompt
Joist hangers and connections Link to Simpsons metalwork
Prompt
Strutting of floor joistsTrada EC5 table 3.2
Prompt
Service penetrationslink in progess
Prompt
Photographs taken

7. Wall Plate (External Walls)

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Prompt
Cavity insulationlink in progess
Prompt
Prompt
Wall plate restraint strapslink in progess
Prompt
Wall plate size and beddinglink in progess
Prompt
Strap spacing and fixinglink in progess
Prompt
Cavity tray at wall plate levellink in progess
Prompt
Photographs taken

8. Roof Inspection

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Size and spacing of rafters and ceiling joistslink in progess
Prompt
Support - bearer plates or wall plates birdsmouthedlink in progess
Prompt
Support by structural memberslink in progess
Prompt
Restraint of inclined memberslink in progess
Prompt
Lateral and vertival restraintLateral Restraintvertical restraint
Prompt
Ridge board and hip rafterslink in progess
Prompt
Purlin support and restraintlink in progess
Prompt
Bracing and stabilitylink in progess
Prompt
Lead Flashingslead flashing guide
Prompt
Photographs taken

9. External Walls

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Prompt
Claddings and renderrenderCladding
Prompt
Masonry support angleslink in progess
Prompt
Cavity barriers - open or closed statelink in progess
Prompt
Sealing - EPDMlink in progess
Prompt
Prompt
Cavity width and insulationlink in progess
Prompt
Wall ties type and spacinglink in progess
Prompt
DPC and cavity trayslink in progess
Prompt
Photographs taken

10. Structural

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
As plan and details
Prompt
Connections between memberslink in progess
Prompt
Site weldinglink in progess
Prompt
Connection to supported memberslink in progess
Prompt
Steelwork certificationlink in progess
Prompt
Beam sizes and spanslink in progess
Prompt
Bearing lengths and packinglink in progess
Prompt
Photographs taken

11. Pre Plaster

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Prompt
Chasing of Masonryinformation
Prompt
Sealing against sound and heat losslink in progess
Prompt
First fix cables and zonesSpecial location and cable zones
Prompt
Above ground draiange present?information
Prompt
Deflection headsBritish Gypsum details
Prompt
Prompt
Prompt
Electrical installation certificate available
Prompt
Photographs taken

12. Pre Suspended Ceiling

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Ductwork for ventilationlink in progess
Prompt
Dampers - fire or fire and smokelink in progess
Prompt
FR walls to underside of slablink in progess
Prompt
Deflection headsBritish Gypsum details
Prompt
Compartmentation integritylink in progess
Prompt
Service penetrations sealedlink in progess
Prompt
Photographs taken

13. Cause and Effect Fire Alarm

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Prompt
Prompt
AOV in stairlink in progess
Prompt
Smoke vents in corridorslink in progess
Prompt
Prompt
Fire and Smoke Curtainlink in progess
Prompt
Fire and Smoke damperslink in progess
Prompt
System zones testedlink in progess
Prompt
Witness test certificate available
Prompt
All cause and effect functions operate correctly
Prompt
Photographs taken

14. Completion

Prompt
Address, plot number, reference, application description of work, date and weather
Prompt
Fire Safety - detection and alternative means of escapelink in progess
Prompt
Flashings and sealing of fabriclink in progess
Prompt
Ventilation provisionlink in progess
Prompt
Water efficient tapslink in progess
Prompt
Above ground drainagelink in progess
Prompt
Heat producing applianceslink in progess
Prompt
Stairs and guarding from fallinglink in progess
Prompt
Access approach, entrance, sanitary facilitieslink in progess
Prompt
Windows open as overheating provisionslink in progess
Prompt
Apparent security issueslink in progess
Prompt
Fast internet provisionlink in progess
Prompt
EV charginglink in progess
Prompt
All certificates received (electrical, heating, ventilation, fire alarm)
Prompt
Building manual/logbook provided
Prompt
Outstanding items if any
Prompt
Ready for Completion Certificate
Prompt
Photographs taken